Scope: Simultaneous 4-Site Perimeter Upgrades & High-Security Systems
Sector: Public Sector / Education Frameworks
The London Borough of Merton, working alongside principal consultants McBains, required an extensive, concurrent security overhaul across four separate active schools in the county. Each school presented its own unique layout, structural bottlenecks, and high-density urban boundary constraints.
Managing a single school infrastructure project is challenging, so executing four simultaneous live-site installations requires masterclass logistics. For the local authority and principal contractor, the core challenges were twofold:
Ensuring an ironclad, standardised safeguarding barrier across all locations.
Contracting a specialist commercial fencing installer capable of working during the active term without disrupting lessons, assemblies, or daily school runs.














As a trusted partner for public sector framework contracts, New Forest Fencing & Gates deployed a highly coordinated strategy. Senior management – including our Directors and Commercial Contracts Manager – devised a phased delivery schedule that treated all four sites with equal precision.
To protect the thousands of pupils across the Merton schools, we rolled out an anti-climb, nedium-high-security mesh fencing system. This specific boundary profile maximises site visibility for school staff while robustly preventing unauthorised access or climb-over attempts.
To make the term-time installation completely stress-free for the headteachers and staff, we implemented strict site control measures:
Temporary Safeguarding Hoarding: Before any work began, heavy-duty temporary hoarding was erected to fully segregate our crews from the pupils and staff.
Out-of-Hours Programming: All heavy groundworks, drilling, and high-noise operations were strategically restricted to evening and weekend shifts.
Zero Disruption Delivery: Materials were moved and deliveries coordinated strictly outside of morning drop-off and afternoon pick-up windows.
A modern school perimeter is only as secure as its entry points. Working seamlessly alongside our automation partners, Openings, our in-house electrical division integrated specialized automated vehicle gates and self-closing pedestrian access systems across the framework. Every single gate was force-tested and handed over with full UKCA/CE compliance certification.
We eliminate the typical sub-contracting risks by handling everything directly.
100% Vetted, School-Ready Crews: Every site team member holds DBS, CSCS, and BPSS certifications, meaning they can step onto active school grounds immediately.
Senior-Level Logistics Oversight: Your multi-site project is personally planned and monitored by our Directors and Commercial Contracts Manager – giving you true accountability and a service you can trust.
In-House Manufacturing Control: We fabricate our own bespoke steelwork and gates in-house. If a site dynamic changes, we adapt the components instantly, bypassing third-party delays.
Tier-1 Framework Accreditations: We already hold ConstructionLine Gold, CHAS Advanced, and Achilles status to slot seamlessly into your pre-qualification requirements.
The multi-site safeguarding contract across the London Borough of Merton was completed strictly on time and within budget. By working flexibly in the background, our teams left all four schools with an immaculate, high-security boundary that looks welcoming while meeting the highest modern safeguarding standards.
Whether you’re a local authority procurement officer, a framework consultant, or an estate manager planning a term-time or holiday shutdown project, our team are ready to deliver. Contact Dean today to request a quote and discuss your requirements.